Forty-two homes carved into a row of listed harbour warehouses, where every new balcony is hung from the existing brick rather than cut into it. The brief was density without erasure — so the industrial rhythm stays legible from the water, and the changes read as one more layer in a long working life.

The harbour front, new balconies hung from the listed brick

Photograph · Atelier Nord

The harbour front, new balconies hung from the listed brick

Photograph · Atelier Nord

The brief

Forty-two homes in warehouses that were never meant to be lived in.

The row of listed warehouses had stood empty for a decade. The client asked for family homes with real outdoor space, daylight deep into the plan and a facade that heritage officers would approve without argument.

The approach

We hung the new balconies from the existing brick piers on slender steel hangers, so nothing touches the ground and nothing is cut from the listed wall. Inside, the deep floors are split by a shared courtyard cut from the middle of each block.

Brick is cleaned and repointed, timber floors are left exposed where they were sound, and every new element is steel, painted the same dark grey as the original crane rails. The new work is legible but never louder than the old.

Project facts

Location

Copenhagen, DK

Year

2025

Scale

5,800 m²

Role

Adaptive reuse & housing

Client

Havnegade Boligselskab

Status

Completed

Partner in charge

Erik Marklund

Photography

Atelier Nord

Plan

A courtyard cut from the centre of every block.

Each warehouse is divided into two thin bars around a shared court. Apartments run through from harbour to courtyard, so every home has light from two sides and a balcony facing the water.

01

Harbour-facing apartments

02

Shared courtyard

03

Hung balconies

var(--variable-m2NufBcwt)

Ground floor plan

1 : 500

Arched warehouse windows with grey steel shutters on the harbour front
Original brick arch opened up with a new oak-framed window
Timber cladding folded into the precast concrete frame

Weight

The balconies weigh nothing, or look as if they do.

Each balcony hangs from two steel rods anchored into the original brick piers above. The floor plate is a folded steel tray with a timber deck, so from the quay the additions read as a thin line drawn across the facade.

var(--variable-ELFTi4PUF)
var(--variable-ELFTi4PUF)

Down to the last detail

Three junctions between new steel and old brick.

Design intent is protected in the details, and details are decided on site. These are the three we spent the most time on.

var(--variable-QgzxbFdkV)

01

Hanger to pier

A single stainless anchor per pier, set into the mortar joint so the brick is never drilled.

var(--variable-QgzxbFdkV)

02

Balcony edge

The folded steel tray is twelve millimetres thick at the edge, with the drainage hidden in the fold.

var(--variable-QgzxbFdkV)

03

Courtyard threshold

Original granite sills are reused as steps down into the courtyard, worn side up.

5,800
5,800
5,800

Gross floor area

38
38
38

Months from brief to opening

42
42
42

Homes, every one with a balcony

0
0
0

Bricks removed from the listed facade

We expected a compromise between heritage and homes. We got both, without either giving way.

var(--variable-L9sjK5JfH)
var(--variable-L9sjK5JfH)

J. Nørgaard

Development Director · Client, Havnegade Terraces

Create a free website with Framer, the website builder loved by startups, designers and agencies.